In April 2025, Glendale voters approved Proposition S, authorizing an $18.18 million debt service to fund a 5-year infrastructure improvement plan (2026–2030). This initiative, guided by the city's Stormwater Master Plan and Streets & Sidewalk Master Plan, aims to enhance public safety, accessibility, and resiliency.

Prop S Logo

Proposed Scope of Citywide Improvements (2026–2030):

  • Reconstruction of 33 sections of street
  • Milling and paving of 6 streets
  • New sidewalks along 2 streets near North Glendale Elementary School
  • Sidewalk repairs on 10 streets
  • ADA-compliant upgrades for all non-compliant sidewalk ramps
  • Construction of 3 major stormwater improvement projects

A complete breakdown of the projects and the proposed five-year schedule is available here

2026 Projects and Updates

The following streets are scheduled for improvement in 2026 as part of the first phase of Glendale’s 5-year infrastructure plan funded by Proposition S. Please note after soliciting further feedback from residents, the sidewalk original proposed for Prop S as part of the 2026 project grouping has been removed from the project list. Click here for more project updates and timelines.

  • Greenview Dr. / Glenvista Pl.
  • Alexandra Ave.
  • Hill Dr. / Armstrong Dr. / Northarm Dr. / Southarm Dr. / Halcyon Dr.
  • Algonquin Estates Rd. / Devon Rd.